Later today, I get to paint the upper half of the stairwell. Then we’ll be able to remove the temporary “floor” that has enabled the guys to work in that area. They stomped the ceilings yesterday and it looks great! Great and we are so pleased with the results. The walls are primed and ready for color.
This is what it is looking like.
North wall:

South wall:

East wall:

The old sub-flooring will be removed today. In addition to the floor going, a portion of the east wall should be removed as well. Leaving a huge opening into the front room. Remember the guys have to get the new sub-floor down and ready for the floor installation on Friday. No pressure there. I have confidence in these two, hard-working men.
This is what will be removed today or tomorrow.